Courses | Profession: truck-mixer and truck-mounted pump operator | lesson 03


Unit

03
Atecap Academy

From the power plant to the construction site – loading and unloading

In Unit 3 we talk about concrete loading operations in a concrete mixing plant and the most important measures for the concrete transport phase. In particular, after having seen what the loading phase involves and the documentation received, the risks associated with the transport of concrete are identified and the behavior to be followed in the event of delay and/or accident.

 

Download the teaching material Document 1 Document 2