Courses | Profession: truck-mixer and truck-mounted pump operator | lesson 04


Unit

04
Atecap Academy

On site – from arrival to unloading and restart

Unit 4 illustrates all the operations to be carried out during the stay on the construction site until the concrete mixer restarts. Therefore the delivery and unloading phase of the concrete at a construction site, the necessary documents, i.e. the information sheet and the transport document, the rules for accessing the construction site, unloading and washing the vehicle.

 

Download the teaching material Document 1 Document 2